PROJECT NUMBER: 27-014
PROJECT TITLE: Artificial Catchment Runoff Quality Analysis (Part 2)
CLIENT: Water Corporation WA
DISCIPLINE: Chemistry and/or Environmental Engineering
SUPERVISORS: A/Prof. Jeremy Leggoe
PROJECT TYPE: Full – Includes 2 consecutive semesters of Research Project units plus 8 weeks of onsite vacation work during university breaks. Full credit of 450 hours will be given toward Professional Practicum Requirements
STUDENTSHIP: $10,000
DEADLINE: Sunday 16th of November 2026 via https://ceed.wa.edu.au/prospective-scholars/apply-now/
DESCRIPTION:
Water Corporation operates several artificial catchments in the Great Southern region that collect and store water. Traditionally, these catchments have used either compacted earth (“roaded”) surfaces or bitumen linings, with bitumen providing significantly higher water runoff. However, bitumen catchments require ongoing maintenance and can deteriorate over time.
New liner materials, including High Density Polyethylene (HDPE) and Bituminous Geomembrane (BGM), may offer improved performance and lower maintenance requirements. While both materials have been used in catchment upgrades, there is still uncertainty about their long-term performance, particularly for BGM, which has experienced operational issues. A modified BGM product has recently been developed to improve heat resistance and durability.
This project will assess the suitability of HDPE and BGM as lining materials for potable water catchments, ensuring they meet AS/NZS 4020 requirements. The work will focus on evaluating the effects of ageing and bushfire exposure, water quality risks, expected service life, field performance, and ongoing compliance. The project will also provide recommendations on material suitability, monitoring, maintenance, risk management, and future large-scale trials.
The scope of the Phase 2 project is to address the outstanding matters that cannot be completed within the timeframe of the first project. The work will:
- Complete the assessment of fire-affected liner materials, including development of a representative bushfire exposure method and analysis of metals, organic compounds, polycyclic aromatic hydrocarbons, microplastics and other potential runoff by-products;
- Extend natural outdoor ageing beyond the initial study period to establish degradation trends for high-density polyethylene (HDPE) and bituminous geomembrane (BGM) products.
- Compare laboratory-aged samples with naturally aged materials to validate the accelerated ageing assumptions used in the first project.
- Develop lifecycle performance models and estimate the expected service life of each liner under Great Southern environmental conditions.
- If available, validate laboratory findings at an operating artificial catchment by sampling runoff and comparing field results with laboratory predictions.
- Assess first-flush water quality risks following prolonged dry summer conditions, including low-storage-volume scenarios.
- Determine whether further testing is required to demonstrate ongoing compliance with AS/NZS 4020 after environmental ageing; and
- Provide recommendations on liner suitability, risk controls, monitoring and maintenance requirements, approval needs and the design of larger-scale field trials.